Prototype, Acceptance and Handover Workbook
Record prototype limits, plan an acceptance scenario and clarify the responsibilities needed for an operational handover.
4 printable A4 pages · 45–60 minutes for one scenario · No signup required · Print to complete by hand; these PDFs are not fillable forms
Identify the stage before recording a result
Use this workbook at a prototype review, when preparing user acceptance testing (UAT), or when discussing handover. Label the stage each time. A prototype observation, a planned test and a completed test result are different records.
GOV.UK's alpha guidance uses prototypes to investigate ideas before a production service. [1] This workbook helps preserve that distinction when recording decisions.
Record what the demonstration can show
State the task, the question being explored and which screens or actions are simulated. Use fictional information. A simulated confirmation cannot establish that a booking, payment or notification was processed.
Record feedback as observations from that exercise. Name the proposed change and decide what needs another review before development proceeds.
Fictional worked example
An appointment prototype lets a customer choose a service and time, then displays a sample confirmation. It uses fixed data and has no live booking integration. Feedback may support a design decision, but the record remains a prototype review.
A later acceptance test would need an implemented system, an authorised environment, an agreed requirement, test data and evidence of the actual result. The workbook does not invent that later outcome.
Prepare an acceptance record
Identify the requirement, scenario, environment, tester and expected result. After execution, add the actual result and evidence. Choose passed, failed, blocked or not tested. Leave a planned test as not tested until it has been run and reviewed.
Include relevant error and permission scenarios. Arrange specialist security and other technical checks separately; UAT does not replace them. NIST's SSDF places software security practices within the development lifecycle. [2]
Make handover responsibilities visible
Confirm the owners of accounts, content, data, hosting, licences, maintenance and support. Record open defects, the effect of delay and the person authorised to approve the next step. For a release, agree the appropriate recovery and escalation arrangements with the technical team.
Use page 3 for a scenario and page 4 for actions and the decision. Copy these pages for further scenarios. A completed worksheet documents a review; it is not itself permission to release a system, evidence of operational recovery or assurance of compliance.
GRCPreneur's mobile app offering is design and prototyping. Production engineering, live integrations and app-store release need separate arrangements. Keep credentials and sensitive system details in protected records outside this workbook.